The launch of “Promoting the culture of using solar energy and integrated ecosystems” closing conference activities at Al-Azhar University
Implementation by: Forum of Dialogue and Participation for Development “FDPD”
Funded by: Global Environment Facility “GEF” - Small Grants Program “SGP”
The Conference was the closing to the project's activities of (Promoting the culture of Using Solar Energy and Integrated Ecosystems at Al-Azhar University), implemented by FPDP, and funded by the United Nations Development Program "UNDP", GEF and SGP - Egypt.
The Grand Imam Hall in the presidency building of Al-Azhar University in Nasr City hosted the activities of the project’s final conference, which was held under the patronage of the Grand Imam Prof. Dr. Ahmed Al-Tayeb “Sheikh of Al-Azhar Al-Sharif” and Ms. Dr. Nevin Al-Kabbaj “H.E. Minister of Social Solidarity”, in the presence of Prof. Dr. Mahmoud Seddik “Vice President of Al-Azhar University for Postgraduate Studies and Head of the Community Service & Environmental Development Committee at the university”. And also, in the presence of Dr. Emad El-Din Adly "SGP - National Director", Prof. Ayman Abdul Mawgood "The Assistant of the Minister of Social Solidarity Affairs for Civil Work Institutions", and Dr. Samar Youssef Sa’afan “FDPD - Chairman of Board of Directors”.
A group of university professors, public figures and representatives of governmental and civil organizations concerned with environmental issues participated in the conference, where a documentary film and review of the project's activities were presented that covered a period of a year and a half inside Al-Azhar University.
On the sidelines of the conference, the official inauguration of two solar power plants established on top of the main and administrative building of the university with a total capacity of 104.4 kilowatts was held. Also, a cooperation protocol was signed between Al-Azhar University and the Forum for Dialogue and Partnership for Development “FDPD to implement a strategic plan that ensures the sustainability of the project’s achieved results. The project activities included:
Two solar power plants established with a total capacity of 104.4 kilowatts.
Creating platform plants islands and planting dense shade trees inside the university campus.
Replacing regular neon bulbs with energy-saving LED bulbs inside the administrative offices in the main building, and regulating the lighting working hours system inside the building’s corridors with timer panels
Supply and installation of waste disposal units inside the university campus, as well as inside the main and administrative building
Developing and raising the efficiency of students’ sidewalk-seats and lighting them with solar energy, in addition of providing a USB unit to charge mobile phones using clean energy.
Implementation of 16 workshops for university employees, security personnel, housekeepers, male and female students to raise awareness of the integrated ecosystem model inside the university.
Supplying and installing water saving units in toilets of the main and administrative buildings.
Link to the Post on the forum's Facebook page:
https://www.facebook.com/fdpdegypt/posts/5460615863966460
No events |
Address: 11 El-Tobgy Street - Dokki - Giza : Fax: +202 333 728 92 : Tel: +202 374 829 23 : E-mail: This e-mail address is being protected from spambots. You need JavaScript enabled to view it. / This e-mail address is being protected from spambots. You need JavaScript enabled to view it.
Application 0.001 seconds (+0.001); 0.35 MB (+0.353) - afterLoad
Application 0.121 seconds (+0.120); 2.22 MB (+1.862) - afterInitialise
Application 0.147 seconds (+0.026); 2.81 MB (+0.594) - afterRoute
Application 0.241 seconds (+0.095); 4.02 MB (+1.210) - afterDispatch
Application 0.257 seconds (+0.016); 4.13 MB (+0.110) - beforeRenderModule mod_custom (English Footer Links and Copyright)
Application 0.265 seconds (+0.008); 4.15 MB (+0.017) - afterRenderModule mod_custom (English Footer Links and Copyright)
Application 0.265 seconds (+0.000); 4.14 MB (-0.001) - beforeRenderModule mod_custom (English Contact Info)
Application 0.272 seconds (+0.007); 4.16 MB (+0.013) - afterRenderModule mod_custom (English Contact Info)
Application 0.273 seconds (+0.000); 4.16 MB (+0.002) - beforeRenderModule mod_jevents_latest (English Latest Events)
Application 0.365 seconds (+0.093); 5.50 MB (+1.345) - afterRenderModule mod_jevents_latest (English Latest Events)
Application 0.365 seconds (+0.000); 5.50 MB (-0.008) - beforeRenderModule mod_custom (English Projects Left Banner)
Application 0.368 seconds (+0.003); 5.50 MB (+0.003) - afterRenderModule mod_custom (English Projects Left Banner)
Application 0.369 seconds (+0.001); 5.50 MB (-0.001) - beforeRenderModule mod_banners (News)
Application 0.406 seconds (+0.037); 5.61 MB (+0.114) - afterRenderModule mod_banners (News)
Application 0.407 seconds (+0.000); 5.61 MB (-0.001) - beforeRenderModule mod_exmenu (English Left Sub Menu)
Application 0.436 seconds (+0.029); 6.06 MB (+0.453) - afterRenderModule mod_exmenu (English Left Sub Menu)
Application 0.436 seconds (+0.000); 6.06 MB (-0.007) - beforeRenderModule mod_exmenu (English Left Menu)
Application 0.461 seconds (+0.025); 6.48 MB (+0.420) - afterRenderModule mod_exmenu (English Left Menu)
Application 0.461 seconds (+0.000); 6.47 MB (-0.005) - beforeRenderModule mod_exmenu (English Top Tabs)
Application 0.474 seconds (+0.012); 6.53 MB (+0.058) - afterRenderModule mod_exmenu (English Top Tabs)
Application 0.474 seconds (+0.000); 6.52 MB (-0.006) - beforeRenderModule mod_exmenu (English Menu)
Application 0.527 seconds (+0.053); 6.69 MB (+0.165) - afterRenderModule mod_exmenu (English Menu)
Application 0.527 seconds (+0.000); 6.68 MB (-0.006) - beforeRenderModule mod_languages (lang)
Application 0.544 seconds (+0.017); 6.77 MB (+0.088) - afterRenderModule mod_languages (lang)
Application 0.551 seconds (+0.007); 6.81 MB (+0.037) - afterRender